IDLEPOWERIDLEPOWER

Pods put up to 160 GPUs on power a site already has

Modular edge data centers in two sizes, 125 kW and 250 kW, plus a mobile Battery Pod. They sit in a few parking spaces, connect behind the host's existing service and move when the site's needs change.

250 kWLargest pod
160H100-class GPUs in a Pod 250
1 MWhStored in a Battery Pod
10 ftClearance around the battery
~1 yearTypical stay at a host
IDLEPOWER

Meet the Pods

Each pod is a complete edge data center in a standard container: GPU servers, networking, cooling, power distribution and controls. A Battery Pod beside it covers peaks and grid events.

Key features

  • Modular and mobile

    Standard 20 ft and 40 ft containers that move to a new host when load or financing changes.

  • Runs on the existing service

    Modulo Site AI holds the import limit, so a site that's ready now needs no new service.

  • Serves offline

    Each pod runs its own Kubernetes with models cached on site, so it keeps answering when the link drops.

Engineered for spare-capacity sites

GPU configuration
Pod 125: power for IdlePower equipment
125 kW
Pod 125: GPUs
Up to 80, H100-class, in 10 servers of 8
Pod 250: power for IdlePower equipment
250 kW
Pod 250: GPUs
Up to 160, H100-class, in 20 servers of 8
Model serving
KServe with vLLM and Triton

GPU counts scale a reference pod of 48 H100 GPUs at 75 kW.

Pod configurations

Pick the size the site's headroom allows. Most sites start with one pod and one battery.

IDLEPOWER
125 kW · 20 ft

Pod 125

Up to 80 GPUs for sites with room for one smaller pod. The usual starting point.

IDLEPOWER
250 kW · 40 ft

Pod 250

Up to 160 GPUs for sites with more headroom, such as logistics parks and plants.

IDLEPOWER
250 kW / 1,000 kWh

Battery Pod

Covers peaks and grid events, and moves between hosts by season.

On site

One controller holds the whole site to its limit

Modulo Site AI sits between the meter and everything behind it: the host's own loads, the battery and the GPU pod. The pod never pushes the site past the service it already has.

One-line view of a siteSimplified

From site check to a live pod

Modulo Digital Twin does the first pass from a desk. The rest follows the same five steps at every site.

  1. 01

    Site check

    Bills, photos and Modulo Digital Twin's first read.

  2. 02

    Design

    Pad, service connection and clearances.

  3. 03

    Permits and limits

    Fire permit and any utility limit agreement.

  4. 04

    Delivery

    Pod and battery set and connected.

  5. 05

    Live

    The Modulo Orchestrator takes over.

What the site provides

  • Room for a pod in a few parking spaces
  • A battery pad with 10 ft clearances
  • Spare capacity on its existing service
  • Fiber or another reliable network link
  • Truck access for delivery

What IdlePower delivers

  • The pod, the Battery Pod and Modulo Site AI
  • Installation through a local electrical contractor
  • Monitoring and operations
  • Settlement from the revenue meter
Codes and standards

Designed to the rules for batteries and service capacity

Mobile batteries and added load on an existing service both have clear rules in California. We design every site to them.

California Fire Code 1207.10
Mobile battery permits, 10 ft clearances and stay limits
UL 9540
Listed battery systems
UL 3141 or NEC 220.70
The control system that holds the import limit
Rule 21
Interconnection for grid-parallel batteries at each dock
DOT hazmat (UN3536)
Whenever a battery moves by road

Put idle power to work

Still have questions? Write to hello@idlepower.ai.